I’ve been informed by one of my most affectionate reader that some acronyms that I’m using in the blog are not immediately clear.
Therefore I’ve started a first list of the most used ones – special thanks to Janos for helping expanding the list:
| AEP | Annual energy production. |
| BoP | Balance of plant. All civil (roads, foundations, crane pads) and electrical works (cables, substation, etc.) in the wind farm. |
| CapEx | Capital Expenditures |
| COD | Commercial operation date |
| COE | Cost of energy |
| EIS | Environmental impact sudy |
| EPC | Engineering procurement and construction. A type of contract (also known as “turnkey”) |
| FIDIC | International Federation of Consulting Engineers (Fédération Internationale Des Ingénieurs-Conseils) |
| HS | Health and safety |
| HV | High voltage |
| IPP | Independent power producer |
| IRR | Internal Return Rate |
| LD | Liquidates damages |
| MLA | Mechanical Load Assessment |
| MV | Medium voltage |
| MW | Megawatt |
| O&M | Operation and maintenance |
| OEM | Original equipment manufacturer. Here, the company producing the wind turbine. |
| OMA | Operation and Maintenance Agreement (sames as SMA) |
| OpEx | Operation expenditures |
| PCC | Point of common coupling |
| PPA | Power purchase agreement |
| RoW | Right of way. The legal right to use a certain route. |
| S&I | Supply and installation |
| S/S | Substation |
| SCADA | Supervisory control and data acquisition |
| SMA | Service and Maintenance Agreement (same as OMA) |
| SoW | Scope of work |
| TSA | Turbine supply agreement. The contract between the wind turbine manufacturer and the wind farm developer. |
| W&S | Wind and site. Usually, either the assessment of the wind farm (W&S study) or the department doing it. |
| WF | Wind farm |
| WTG | Wind turbine generator |