Tag: Contract

  • Taking over – it really matters

    One of most the relevant milestones in the life of a wind farm is the taking over. It happens when the contractual requirements for the wind farm are considered fulfilled by the subcontractor, except for smaller items that are noted in a “punch list” and have to be fixed as soon as possible. The requirements…

  • Wind Farms construction contracts

    Wind farms can generally be broken down into 2 separate areas of construction: Turbines: supply, installation and commissioning of wind turbines and towers Balance of Plant (BoP) works: everything else needed except the turbines (foundations, substations, cabling, etc.) Several option are available to the developers: The first option is that the wind farm Special Purpose…