  • Narrow track cranes

    In wind farms construction usually at least 2 cranes are needed: a main crane to lift component such as tower segments, blades and rotor and a smaller crane called “auxiliary” that help the main crane during the lift operations to manipulate the wind turbine component. The auxiliary crane can also be used to move steel…

  • Nacelle Trailer (Low Loader)

    Nacelle trailer (also called low loader) is one of the special vehicles currently used to carry WTG components from the factory to the wind farm. His peculiarity is that it’s very low, only a few centimetres above the road: this is to allow transportation on public road, where bridges with a free height of 5…

  • Carrying blades with a balloon

    In very complicated wind farms blades and sometimes other components are carried by helicopters – an expensive solution, to be used only as “last option”. What I’ve discovered today is that a balloon was used by CL CargoLifter to carry the blades in a small scale test made for Nordex at the former airport of…

  • Wind turbines components transport problems

      Transport related problems occupy a relevant percentage of time in my department. It’s no big surprise, considering that the models that we are selling (V90, V100 and V112) have blades up to 55 meters. Usually we have 3 different kinds of problems: Bending radius Vertical transition curves (for instance on top of hills) Weight…

  • LEGO and Vestas: The unlikely duo

    As you probably know if you are in the wind sector both LEGO and Vestas are Danish companies, so it is not a big surprise to discover that several wind turbines related products are produced by LEGO. Not only the “standard” LEGO City 7747 Wind Turbine Transporter, but even a personalized, limited edition set (known…

  • Wind Farms construction contracts

    Wind farms can generally be broken down into 2 separate areas of construction: Turbines: supply, installation and commissioning of wind turbines and towers Balance of Plant (BoP) works: everything else needed except the turbines (foundations, substations, cabling, etc.) Several option are available to the developers: The first option is that the wind farm Special Purpose…

  • Medium Voltage Cables Optimization

    The optimum design of the medium voltage (MV) cables consists in finding the best compromise between the initial cost of the cables and the total energy loss of the system. For this reason we design wind farms with a radial network, and section of the cables decreasing from substation to the most faraway point of…

  • What is this BoP?

    BoP is an English acronym that stands for Balance of Plants. In the wind farms sector, it means everything but the wind turbines. Basically there are 3 types of Wind Farm contracts commonly used: Supply only. It include WTGs, SCADA, Installation supervision and Commissioning. Supply and Installation, including all the items in Supply only plus…

  • Geotextile vs Geogrid: which is the best solution?

    This is a debate we are living each time we have to build internal roads on soils with a low (<5) to very low (<2) CBR. Basically when the others alternatives (mainly soil substitution and soil improvement) are not feasible we are adopting two different solution, either a strong geotextile with reinforcement and separation properties…