Talinay Oriente 90MW EPC Wind Farm

Although I don’t normally post stories about wind farms I’ve worked at I want to do an exception for Talinay, a project with whom I have a relationship almost emotional.

Located in Chile, in the Coquimbo province, near the Limarí river, it has been a project entirely developed by Vestas with internal founds and my first “hands on” EPC experience.

We’ve had the pleasure of optimizing the layout both in the preliminary phase, working together with the wind & site team, and in the constructive project. It was tough, because it is located in a mountainous area where impressive earthworks are needed.

It is a mix of V90 and V100 turbines of the 2MW platform, with an installed capacity of 90 MW.

Connected to the grid in March 2013, it has been constructed at an amazing, “china style” speed: with almost 400 peoples working together on site during the busiest period, it was a record for the foundation (5 per week, with two concrete plants on site working full time day and night) and the turbine installation (4 WTG per week).

The wind farm was completed in 6 months.

Almost all the big players of the sector have been involved: from the engineering side support was provided by IDOM, SISENER and ESTEYCO, while the main subcontractor was GES who worked with local and international subcontractors (among them, Hormigones Melón, Burger Gruas and CJR).

On the electrical side, it was one of the first (or maybe the first) PASS installed in Chile. The transformer was developed at lightning speed (155 days ex works), while the substation was made by ABB and Siemens.

Now is property of the Italian utility ENEL Green Power, who also signed a service agreement. Part of the money of the deal comes from a loan from Denmark’s Export Credit Agency (EKF). ENEL has an aggressive expansive approach in the Chilean market, where is developing several other wind farms (some of them with Vestas).

Below you will find several interesting pictures: two trucks pulling a tower section due to the high slope of the road, PASS switchgear and line trap, concrete plant and other interesting views of the wind farm.